Project: BuckRV-8   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Buck Wyndham   -  
Project:   Vans - RV-8   -   VIEW REPORTS
Total Hours:3914.15
Start/Last Date:Jan 08, 2002 - No Finish Date
Engine:AeroSport Power IO-375-M1S
Propeller:Whirlwind 330-3B/72H-73 3-blade CS
Panel:G3X, G5, GTN650, GTR20, GTX45R, GMA245, GMC507
 
Friendly URL: https://eaabuilderslog.org?s=BuckRV-8

Home or Last Project Picture

Aug 11, 2007     Wiring conduit; landing light - (2.6 hours)       Category: Wings
Wow -- an incredibly productive day today! I chalk this up to the fact that I've done today's projects before, on the left wing.

I began by marking, pilot-drilling, and enlarging the conduit holes in each wing rib to 3/4". Then I deburred the holes, masked them off, and shot primer around each hole. After it dried, I cut about 11 feet of conduit and installed it in all but the four inboard ribs. Total time elapsed on the conduit: 1.8 hours so far. (This was the same job that took over 7 hours of work the first time!)

Next, I prepped and taped the Duckworks landing light template to the wing, and marked the wing skin for cutting.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.